A 100 kWp rice mill in Khammam, Telangana — based on a WattZap site analysis (name withheld); figures indicative.

Chapter 1

Where every mill starts.

₹28.4 lakh/year
~₹11/unit · ~2.58 lakh units/year
the annual bill — something is hiding in the right end of it

A busy rice mill in Khammam. Motors running through the day. The bill arrives, it gets paid. Nobody asks what's inside it.

Chapter 2

The audit finds the leak.

~70% energy you actually used
~30% demand
~₹8.4 lakh/year — driven by motors starting at the same time.

The audit starts with a free bill review, then a 2–4 week load study with a data logger on your incoming supply. No cost, no obligation — just a clear picture of what the mill actually pays for, including the charges that never show up as "energy".

Step 1 is always free.
Chapter 3

The savings map.

Four levers, one bill: from ₹28.4L/year down to ₹19.0L/year — ₹9.4L of identified savings potential.

₹28.4LToday−₹5.2LSolar−₹1.1LPower factor−₹2.2LDemand right-sizing−₹0.9LToD shift₹19.0LAfter₹9.4Lidentified savings potential
breakdown illustrative pending final offer
  • ₹5.2LRooftop solar — cheaper units, generated right where they're used.
  • ₹1.1LPower factor correction — stop paying penalties for reactive power.
  • ₹2.2LStaggered motor starts — the same machines, started 90 seconds apart.
  • ₹0.9LTime-of-day shift — flexible loads moved to cheaper grid hours.
Chapter 4

Built at our cost, not yours.

1
Data check
Your last 12 months of bills
2
Load study
2–4 weeks, data logger on site
3
Final offer, you decide
Measured numbers, no pressure
4
Build & commissioning
18–24 weeks, DISCOM approvals handled by WattZap

You don't sign until you've seen measured numbers from your own mill.

Chapter 5

Two ways to go solar.

WattZap lease
  • • ₹0 upfront · savings from day one
  • • Every operating risk on WattZap — we own and operate the plant
  • • Savings measured monthly — verified on your bill
  • • Own the plant from Year 8 at a price printed in the contract
Your net savings share: ≈₹6.6 lakh/year (illustrative)

"You are not choosing renting over owning. You are choosing owning later, without risk, over owning now, with all of it."

Chapter 6

The 25-year journey: lease it, then own it.

Years 1–12: ₹0 invested, WattZap owns and operates, you bank measured savings. At Year 12 you buy the plant for ₹1 lakh — a price printed in the contract. From Year 13, it's yours, and the annual benefit jumps 3–4×.

₹0L
banked during the lease
₹0L
after it becomes yours
₹0.0 Cr
25-year total, from ₹0 invested today
₹10L₹20L₹100L₹200L₹300Lnet ₹L/yrcumulative ₹LYear 12 — you take ownership(₹1 lakh, price printed in the contract)One-time costs already included:buyout + new inverter≈ ₹2.9 crore total151012152025year
Lease years — ₹0 invested, WattZap owns & operates Ownership years — the plant is yours Cumulative savings

Real WattZap site audit; indicative and subject to site feasibility, DISCOM approval and definitive agreements. Your mill gets its own version of this chart after a free audit.

This chart gets redrawn with your numbers.

Smart Energy. Lower Bills.

Explore

Contact

  • info@wattzap.in
  • Hyderabad, Telangana, India
© 2026 WattZap Energy Solutions Pvt. Ltd. · All rights reserved.
Privacy PolicyTerms of UseMade in Hyderabad · India
CIN: U35105TS2026PTC219960 · Registered office: H.No. 3-1-322/2, Road No. 7, Mythri Nagar Colony, LB Nagar, Hyderabad, Telangana, India